Wood Floor Fitting…

Professional wood floor fitting service carried out by skilled and experienced craftsmen.

Pre-installation, fitting and finishing applied to residential and commercial properties throughout the UK.

 

Wood Floor Fitting Service

At Prestige Wood Floor Specialists we are able to not only supply but fit all types of wood flooring including:

Unfinished, Prefinished, Engineered, Solid, Plank, Strip, Herringbone, Wood Block, Mosaic, Reclaimed, Sports Flooring, General Repair, Matching and Patching and Lift and Re-lay.

 

We supply and fit to both residential and commercial properties and our specialist wood floor fitters are fully trained craftsmen and have been installing wood floors for many years. Our team of wood floor fitters have worked in all kinds of buildings and in different environments.

 

Prestige Wood Floor Specialists  cover all aspects of sub-floor preparations before any timber flooring should be installed including the removal of existing floor residues, Ply Boarding, Battening and Self Levelling.

 

Our fitting services include:

  • Engineered Wood Flooring
  • Solid Wood Flooring
  • Parquet Wood Flooring
  • Chevron Wood Flooring
  • Sports Flooring
  • All aspects of Sub Floor preparation, including concrete screeding and levelling, DPM application
  • Testing of sub floors for moisture content

Our fully trained floor fitters can also undertake most aspects of joinery associated with floors such as fitting skirting, architraving, doors and fitting wood floor on stairs.

 

Fitting Wood Floors yourself?

 

If you are thinking of buying wood flooring and installing it yourself it is important to consider the following:

  • Moisture – Content of the sub-floor should be less than 5% or 75% RH in concrete
  • Moisture – Relative humidity of a room should be between 40% – 60%

Please note that new concrete screeds will dry at a rate of approx 1″ per month. This means that a 6″ deep screed will take approximately six months before being dry enough to fit a solid wood floor. A damp proof membrane can be applied to speed up the above process before installation

Solid wood flooring should be left on-site for 7-10 days prior to installation so it can acclimatise. Engineered flooring can be installed straight away.